 |
|
 |
|
|
Our Projects - Engineering Industry
|
|
|
|
|
|
JSC SKMZ, Kramatorsk, Ukraine
|
|
Link:
|
http://www.skmz.dn.ua/ |
|
Year:
|
2008 |
|
Technologies:
|
S7-400/ SIMATIC Panel PC 677/ WinCC 6/ MICROMASTER 440/ SIMOVERT VC |
| Project status: |
Completed
|
| Project Description: |
Automated control system of tube straightening technological process |
|
|
|
|
|
|
JC Erdenet, Mongolia
|
|
Link:
|
http://www.erdenetmc.mn |
|
Year:
|
2006 |
|
Technologies:
|
S7 315-2DP/ SIMOVERT VC/ OP77B/ PROFIBUS DP |
| Project status: |
Completed
|
| Project Description: |
Control system of frequency electrodrive of bridge electromagnetic crane with load-carrying ability 30/12,5 tons |
|
|
|
|
|
|
CJSC " DSD ", Krivoj Rog, Zaporozhye
|
|
Link:
|
http://www.dcd.com.ua/ |
|
Year:
|
2004 |
|
Technologies:
|
S7-314/ SIMOREG |
| Project status: |
Completed
|
| Project Description: |
Automated control system of mobile drilling rig. Project, supply, assembly, adjustment |
|
|
|
|
|
|
UA JV "Vlada-Promtex", Kharkov , Ukraine
|
|
Link:
|
http://www.vlada-promtex.com/ |
|
Year:
|
2004 |
|
Technologies:
|
S7-315/ SIMOVERT VC/ OP 77B |
| Project status: |
Completed
|
| Project Description: |
System of frequency electric drive of special electrical magnetic crane with grabs . Project, supply, assembly, adjustment |
|
|
|
|
|
|
CJSC "Zaporozhkran", Zaporozhye , Ukraine
|
|
Link:
|
http://www.kran.zp.ua/ |
|
Year:
|
2004 |
|
Technologies:
|
S7-315/ SIMOVERT VC |
| Project status: |
Completed
|
| Project Description: |
Control system of bridge crane with lifting capacity of 125/20 tons, operating regime A5. Project, supply, assembly, adjustment |
|
|
|
|
|
|
JSC " Motor Sich ", Zaporozhye , Ukraine
|
|
Link:
|
http://www.motorsich.com |
|
Year:
|
2003 |
|
Technologies:
|
SINUMERIK 840D/ SIMODRIVE 611D |
| Project status: |
Completed
|
| Project Description: |
Modernization of control system of lathe ИС800ПМФ4. Project, assembly, adjustment |
|
|
|
|
|
|
JSC "Dneprospetsstal", Zaporozhye , Ukraine
|
|
Link:
|
http://www.dss-ua.com/ |
|
Year:
|
2002 |
|
Technologies:
|
S7-314/ SINUMERIK FM-357 |
| Project status: |
Completed
|
| Project Description: |
Modernization of radial forging machine РКМ -340. Project, supply, assembly, adjustment |
|
|
|
|
|
|
JSC "Motor Sich", Zaporozhye , Ukraine
|
|
Link:
|
http://www.motorsich.com |
|
Year:
|
2002 |
|
Technologies:
|
ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Program-technical complex of NC machines control in shop No.11. Project, supply, assembly, adjustment |
|
|
|
|
|
|
JSC " Motor Sich ", Zaporozhye , Ukraine
|
|
Link:
|
http://www.motorsich.com |
|
Year:
|
2002 |
|
Technologies:
|
S7-315/ WINCC v5 |
| Project status: |
Completed
|
| Project Description: |
Modernization of control system of electroplating coating line VAS . Project, supply, assembly, adjustment |
|
|
|
|
|
|
OSC "VIT", Zaporozhye , Ukraine
|
|
Link:
|
|
|
Year:
|
2002 |
|
Technologies:
|
S7-315/ OP 270/ SIMODRIVE 611U /MICROMASTER |
| Project status: |
Completed
|
| Project Description: |
Development of control system of metal cross cutting line. Project, supply, assembly, adjustment |
|
|
|
|
|
|
CJSC "Niko Tube", Nikopol, Ukraine
|
|
Link:
|
http://www.interpipe.biz/ru/company/productions/nikotube/ |
|
Year:
|
2001 |
|
Technologies:
|
S7-314/ WINCC v4.0/ FM-NC |
| Project status: |
Completed
|
| Project Description: |
Modernization of control system of production line "Kri Dan" and two muff threading lathes. Project |
|
|
|
|
|
|
JSC "Azovmash", Mariupol , Ukraine
|
|
Link:
|
http://www.azovmash.com |
|
Year:
|
2001 |
|
Technologies:
|
SINUMERIK 840D/ SIMODRIVE 611D/ PROFIBUS DP |
| Project status: |
Completed
|
| Project Description: |
Modernization of machining center TOSHIBA BSF -32/21 B . Project, supply, assembly, adjustment |
|
|
|
|
|
|
JSC "Motor Sich", Zaporozhye , Ukraine
|
|
Link:
|
http://www.motorsich.com |
|
Year:
|
2001 |
|
Technologies:
|
SINUMERIK 840D/ SIMODRIVE 611D |
| Project status: |
Completed
|
| Project Description: |
Modernization of control system of two lathes TFM100 and one lathe SKRa. Project, assembly, adjustment |
|
|
|
|
|
|
JSC "Motor Sich", Zaporozhye , Ukraine
|
|
Link:
|
http://www.motorsich.com |
|
Year:
|
2001 |
|
Technologies:
|
SINUMERIK 840D/ SIMODRIVE 611D |
| Project status: |
Completed
|
| Project Description: |
Modernization of control system of two lathes MC 32. Project, assembly, adjustment |
|
|
|
|
|
|
JSC " Motor Sich ", Zaporozhye , Ukraine
|
|
Link:
|
http://www.motorsich.com |
|
Year:
|
2001 |
|
Technologies:
|
SINUMERIK 840D/ SIMODRIVE 611D |
| Project status: |
Completed
|
| Project Description: |
Modernization of control systems for Horizont lathes with 5 axes . Project , assembly , adjustment |
|
|
|
|
|
|
JSC "Motor Sich", Zaporozhye , Ukraine
|
|
Link:
|
http://www.motorsich.com |
|
Year:
|
2001 |
|
Technologies:
|
SINUMERIK 840D/ SIMODRIVE 611D |
| Project status: |
Completed
|
| Project Description: |
Modernization of control system for Horizont lathes with 4 axes . Project , assembly , adjustment |
|
|
|
|
|
|
JSC "Dneprospetsstal", Zaporozhye , Ukraine
|
|
Link:
|
http://www.dss-ua.com/ |
|
Year:
|
2001 |
|
Technologies:
|
ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Installation of program - technical complex for control of four NC machines systems in mechanical - repair department . Project, supply, assembly, adjustment |
|
|
|
|
|
|
JSC "Motor Sich", Zaporozhye , Ukraine
|
|
Link:
|
http://www.motorsich.com |
|
Year:
|
2000 |
|
Technologies:
|
Sinumerik 850TE |
| Project status: |
Completed
|
| Project Description: |
Modernization of 3 lathes of Sedin-Shiess company. Project, assembly, adjustment |
|
|
|
|
|
|
JSC " KMSC " Krivirozhstal ", Krivoj Rog , Ukraine
|
|
Link:
|
http://www.mittalsteel.com.ua |
|
Year:
|
1999 |
|
Technologies:
|
SINUMERIK 820/ SIMODRIVE 611 |
| Project status: |
Completed
|
| Project Description: |
Modernization of Gerkules milling machines with CNC system ( gaps in the caliber of roll , engraving spindle ). Project, supply, assembly, adjustment |
|
|
|
|
|
|
JSC "Motor Sich", Zaporozhye , Ukraine
|
|
Link:
|
http://www.motorsich.com |
|
Year:
|
1999 |
|
Technologies:
|
SINUMERIK FM-NC |
| Project status: |
Completed
|
| Project Description: |
Modernization of CNC system of turning lathe MDW 10 produces by Max Muller . Project, assembly, adjustment |
|
|
|
|
|
|
JSC Zaporozhye Metallurgical plant "Zaporozhstal", Zaporozhye, Ukraine
|
|
Link:
|
http://www.zaporizhstal.com/ |
|
Year:
|
1998 |
|
Technologies:
|
S5-115U |
| Project status: |
Completed
|
| Project Description: |
Modernization of control systems of automated cutting line ZUNDWIG . Project, assembly, adjustment |
|
|
|
|
|
|
JSC "Hemoplast", Belgorod-Dnestrovsky , Ukraine
|
|
Link:
|
http://hemoplast.kiev.ua |
|
Year:
|
1998 |
|
Technologies:
|
S5-100U |
| Project status: |
Completed
|
| Project Description: |
Modernization of control system of packing machine Formapack 2000. Project, assembly, adjustment |
|
|
|
|
|
|
 |
|
New Company NameMonday, March 01, 2010 | | Parent company Sony Corporation transfers the measuring systems business (Magnescale, Laserscale, digital gauge) of Sony Measuring Systems to Mori Seiki (Magnescale trade mark). |
TRAINING COURSE ST-BWINCCSMonday, March 01, 2010 | | ATTENTION!!!
Training Center of INFOCOM LTD, Zaporozhye, invites you on a training course ST-BWINCCS (visualization system WinCC (SCADA-system – dispatching and data aquisation)). |
Change of Quality Standard into ISO 9001:2008Thursday, January 28, 2010 | | INFOCOM LTD had passed the audit of the Certification Body of TÜV SÜD Management Service GmbH and services provided by INFOCOM LTD are certified according to the newest quality management system standard ISO 9001:2008.
read more... |
INFOCOM LTD is ABAS Software PartnerMonday, May 18, 2009 | | 
INFOCOM LTD - partner of ABAS Software AG.
ABAS Software AG is the best ERP-supplier according to Konradin Media Group research. read more ... |
|
|
|
|
 |
 |
 |
 |
 |
 |
Our address: Ukraine, 69001, Zaporizhzhia, bul. Tarasa Shevchenko, 56 (map).
Phone: +380 (61) 213-78-55, +380 (61) 213-79-55. Fax: +380 (61) 213-48-66
|
|